Добро пожаловать, Гость
Пожалуйста Вход или Регистрация.    Забыли пароль?

Change Order of Actions for AnomalyHunterSpeedTank
(0 чел.) 
ВнизСтраница: 1
Сообщения темы: Change Order of Actions for AnomalyHunterSpeedTank
#60127
Change Order of Actions for AnomalyHunterSpeedTank 2 мес., 3 нед. назад Репутация: 0
Would it be possible to change the sequence of operations from AnomalyHunterSpeedTank after landing in Site ?

Problem:
Код:

Bot lands my VNI at 70 in Rock-Haven
Bot checks if he is in right bookmark 
Bot checks local
Bot checks if someone is in Anomaly
Bot checks if NPC is in Anomaly 
Bot loads „unstuck“ to Dafault Overview Tab
Bot takes nearest Rock to Orbit 
Bot sets orbit
Bot activates Afterburner
Bit checks if drones are out 
Bot launches drones



This Last over 40 seconds

If the VNI is not shot down until then, because of standing too long still in the Site, the drones get the alpha after launching and I lose an average of one drone per Site.

Suggestion:

Код:

Bot lands my VNI at 70 in Rock-Haven
Bot checks if he is in right bookmark 
Bot checks local

[b]Bot checks if drones are out 
Bot launches drones
Bot loads „unstuck“ to Dafault Overview Tab
Bot takes "Pirate Gate" to Orbit, because thats the middle of the site 
Bot sets orbit
Bot activates Afterburner[/b]

Bot checks if someone is in Anomaly
Bot checks if NPC is in Anomaly 
Bot is just doing his work



So, the drones can "work" and got no aggro because the are soon enough in space and after that, bot can do the rest.

How can i change the order of actions from bot or is it possible that you can optimize it like suggested only for AnomalyHunterSpeedTank ?
BenBo
Fresh Boarder
Постов: 9
graphgraph
Пользователь в оффлайне Кликните здесь, чтобы посмотреть профиль этого пользователя
Для добавления сообщений Вы должны зарегистрироваться или авторизоваться
 
#60132
Re: Change Order of Actions for AnomalyHunterSpeedTank 2 мес., 3 нед. назад Репутация: 802
First of all try to speed up bot. Set mouse speed like 5 and make as people and places as local window visible all the time (not overlapping). This way bot will spend less time for local scan and bookmark check.

To not load "unstuck preset" you can merge presets in first run wizard settings with e.g. "asteroids". Type the same name in both presets. Asteroids preset used by miner and loaded default into 1st tab. Switching between tabs in overview is faster then loading preset.

>If the VNI is not shot down until then, because of standing too long still in the Site, the drones get the alpha after launching and I lose an average of one drone per Site.
Do you believe if you launch drones faster NPC will not reaggro on drones as they are busy targeting your ship? Did not get an idea why you think you will not loose drones if you switch order of actions.
Slav2
Администратор
Постов: 16402
graph
Пользователь в оффлайне Кликните здесь, чтобы посмотреть профиль этого пользователя
Для добавления сообщений Вы должны зарегистрироваться или авторизоваться
Send logs to my mail - with subject 'log files' to pass spam filter.
How to record logs in knowledge base
 
ВверхСтраница: 1
Модераторы: Slav2
© Macro Laboratory 2023
Все права защищены!
Design by Ivan Kozyrin